Influence of shunt reactor compensation scheme on overvoltage distribution along 500 kV submarine cable
Author:
Affiliation:

Clc Number:

TM726

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    AC submarine cable is an important component in AC transmission system of offshore wind farms. However,the issue of charging current limits its application in offshore wind power with long-distance and large-capacity. Taking HYJQF41-F290/500 kV single-core AC submarine cable as an example,the overvoltage distribution along the cable in different working conditions is analyzed,considering the long-distance and high-voltage transmission. The simulation model of the cable is established and its parameters are corrected firstly. According to the different compensation degrees of the shunt reactor,the capacity of the shunt reactor under the configuration scheme of single-end compensation and two-end compensation calculated out. Finally,based on the single-phase grounding fault,the closing and opening conditions in the high-voltage and long-distance wind farm models,and the distribution law of overvoltage along the submarine cable under different reactive power compensation schemes is tested by simulation. The results show that the maximum overvoltage of submarine cables appears in different positions with different compensation schemes. Based on this,the selection methods for high-voltage submarine cable and overvoltage in insulation level design of substation equipment are given out under different compensation schemes,which have certain guiding significance for engineering practice.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 18,2024
  • Revised:March 05,2024
  • Adopted:October 24,2023
  • Online: July 23,2024
  • Published: July 28,2024
Article QR Code