Abstract:Energy-intensive enterprises have great potential in consuming curtailed wind power. While there are few decision making methods to support the regulation capacity or intended regulation curve report of enterprises. Thus, on the basis of benefit analysis of energy-intensive enterprise taking part of the regulation, a decision making model which is intended to maximize both the benefit of involved energy-intensive enterprise and the consumption of curtailed wind power is proposed. Besides, the decision making method for the energy-intensive enterprise is put forward and NSGA-Ⅱ is employed for calculation in the model. A proper compromised solution is picked with application of additional constraints and satisfaction index. Finally, the effectiveness of the proposed method is verified through case analysis.