Comparison and Selection of MV Distribution Network Planning Schemes Considering Reliability Assessment
Author:
  • Article
  • | |
  • Metrics
  • |
  • Reference [18]
  • |
  • Related
  • | | |
  • Comments
    Abstract:

    From two aspects of the collection and calculation methods of reliability parameters and the selection of planning schemes,a formation and selection method of MV distribution network planning schemes considering reliability assessment is proposed in this paper,and the application of the guidance on the reliability evaluation of MV distribution network is furtherly enriched.This method includes parameter collection,reliability evaluation algorithm and formulation and comparison of schemes.Cooperating reliability and economy,the incremental net benefit model of investment is proposed based on "with&without comparison evaluation method",and the difference between the simplified model and the scheme comparison method based on life cycle cost minimization is analyzed under different power supply capacity and load demand.The investment cost&benefit is analyzed based on dynamic economic indicators,such as net present value and net present value rate,which can be used for multiple options.The case shows that the proposed method is feasible and effective.

    Reference
    [1] DL/T 1563-2016中压配电网可靠性评估导则[S]. DL/T 1563-2016 Reliability evaluation guidlines for distribution system of medium voltage[S].
    [2] 万凌云,王主丁,伏进.中压配电网可靠性评估技术规范研究[J].电网技术, 2015, 39(4):1096-1100. WAN Lingyun, WANG Zhunding, FU Jin. Research on technical standard for reliability assessment of medium voltage distribution networks[J]. Power System Technology, 2015, 39(4):1096-1100.
    [3] 宋伟,万凌云,张明君.供电可靠性提升优化策略[J].重庆电力高等专科学校学报, 2016, 21(2):16-19. SONG Wei, WAN Lingyun, ZHANG Mingjun.Optimization strategy of power supply reliability improvement[J]. Journal of Chongqing Electric Power College, 2016, 21(2):16-19.
    [4] 万凌云,张盈,刘真.配电网供电可靠性薄弱环节分析与改进[J].山东电力技术, 2016, 43(6):39-42. WAN Lingyun, ZHANG Ying, LIU Zhen. Analysis and modification of the weak link of power supply reliability in distribution network[J]. Shandong Electric Power, 2016, 43(6):39-42.
    [5] 栗秋华,刘晋军,万凌云.配电网供电可靠性薄弱环节分析[J].云南电力技术, 2016, 44(2):21-22. LI Qiuhua, LIU Jinjun, WAN Lingyun. Analysis of the weak link of power supply reliability in distribution network[J].Yunnan Electric Power, 2016, 44(2):21-22.
    [6] 栗秋华,万凌云,徐江涛.重庆北部新区配电网供电可靠性薄弱环节分析[J].四川电力技术, 2016, 39(3):35-38. LI Qiuhua, WAN Lingyun, XU Jiangtao. Analysis on the weak link of power supply reliability in the distribution network of the northern Chongqing New Area[J]. Sichuan Electric Power Technology, 2016, 39(3):35-38.
    [7] 余文辉,王凯琳,高松川.供电可靠性关键指标分析方法及应用[J].广东电力,2017,30(7):121-125. YU Wenhui, WANG Kailin, WANG Songchuan. Analysis method for critical indicators of power supply reliability and its application[J]. Guangdong Electric Power,2017,30(7):121-125.
    [8] 万凌云,王主丁,庞祥璐.中压配电网可靠性评估参数收集及其规划应用[J].供用电, 2017, 34(6):38-43. WAN Lingyun, WANG Zhuding, PANG Xianglu. Parameter collection and planning application of medium voltage distribution system reliability assessment[J].Distribution&Utilization, 2017, 34(6):38-43.
    [9] 王凯军,孙飞飞,兰洲,等.全寿命周期成本管理在实际电力网络规划中的应用[J].电力建设, 2016, 37(4):43-49. WANG Kaijun, SUN Feifei, LAN Zhou, et al. Application of life cycle cost management in network planning of actual power system[J]. Electric Power Construction, 2016, 37(4):43-49.
    [10] NILSSON J, BERTLING L. Maintenance management of wind power systems using condition monitoring systems-life cycle cost analysis for two case studies[J]. Energy Conversion IEEE Transactions on, 2007, 22眨椱琩栺☲眲椳琭栲漲甹琮‼换潲派灛愱爱楝猠潨滑ₛ攬癐慥氬甘愀瓹椬潉渮⃺涎敌瑃桃澄摍嬵䩑嶛⸵‵压栨懏愹溄碪榽₄䔘氖敛捊瑝爮椵掛⃪储漖瞾攇爬Ⱐ′㈰〱〵㤬⸠35(8):59-64. YANG Jintao, LE Jian, LIU Kaipei, et al. Improvement measure optimization based on LCC for voltage quality of distribution network[J]. Electric Power Automation Equipment, 2015, 35(8):59-64.
    [12] 王卫平.基于全寿命周期成本-效益模型的增量配电网投资风险评估[J].广东电力,2017,30(9):45-51. WANG Weiping. Evaluation on investment risk of incremental power distribution network based on full life cycle cost and benifit model[J]. Guangdong Electric Power,2017,30(9):45-51.
    [13] 周伟民,李成,丁慧.基于全寿命周期的35 kV电网规划方案SEC比选方法[J].电子技术与软件工程, 2017(2):243-244. ZHOU Weimin, LI Cheng, DING Hui. The 35 kV network planning scheme SEC comparison method based on LCC[J]. Electronic Technology&Software Engineering, 2017(2):243-244.
    [14] 刘晓燕.基于全寿命周期管理的电力设备状态检修成本研究[J].电力工程技术, 2016, 35(5):74-76. LIU Xiaoyan. Research on state maintenance cost of power equipment based on life cycle management[J]. Electric Power Engineering Technology, 2016, 35(5):74-76.
    [15] 闫敏,李红霞,张媛.基于全寿命周期的投资效益评估方法[J].电网技术, 2014, 38(s1):48-52. YAN Min, LI Hongxia, ZHUANG Yuan. Research of investment post-evaluation methods based on life cycle[J]. Power System Technology, 2014, 38(s1):48-52.
    [16] 杨江,宣伟锡,姜念.基于全寿命周期的城市电力管沟规划建设模式研究[J].电力工程技术, 2016, 35(3):34-38. YANG Jiang, XUAN Weixi, JIANG Nian. Research on urban power pipe ditch planning and construction based on LCC[J]. Jiangsu Electrical Engineering, 2016, 35(3):34-38.
    [17] 国家发改委.省级电网输配电价定价办法发改价格([2016] 2711号)2016. National Development and Reform Commission. Pricing method of transmission and distribution for provincial power grid ([2016] 2711)2016.
    [18] 王绵斌,谭忠富,张蓉.基于"增量法"下的电网投资风险评估模型[J].电工技术学报, 2006, 21(9):18-24. WANG Mianbin, TAN Zhongfu, ZHANG Rong, et al. Risk evaluation model of the power grid investment based on increment principle[J]. Transactions of China Electro Technical Society, 2006, 21(9):18-24.
    [19] 关沛,李智勇.基于"有无对比法"的城市电网规划项目的经济性分析[J].陕西电力, 2009, 37(10):92-96. GUAN Pei, LI Zhiyong. Economic analysis of urban power network planning projects based on ���������������������������������������������������������������������������
    Related
    Cited by
    Comments
    Comments
    分享到微博
    Submit
Get Citation
Share
Article Metrics
  • Abstract:1612
  • PDF: 2513
  • HTML: 0
  • Cited by: 0
History
  • Received:November 04,2017
  • Revised:December 12,2017
  • Adopted:January 08,2018
  • Online: April 02,2018
Article QR Code