Research on Multi-time Scheduling of Accommodating PhotovoltaicConsidering the Error of Photovoltaic Prediction
Author:
Affiliation:

Clc Number:

Fund Project:

The National High Technology Research and Development Program of China (863 Program)

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    From the perspective of power suppliers in electricity market,the multi-time scheduling model is built considering the uncertainty of photovoltaic power prediction,photovoltaic is consumed and tracked by using battery and air-conditioning demand response resource.The model ensures the economy and the sufficiency of demand response resources that can consume the error of the value of photovoltaic forecast.The uncertainty of photovoltaic power is taken as chance constraint in the day-ahead scheduling model and converted into certainty equivalent condition when solved,the minimum unbalance and minimum regulation are taken as objects in the intra-day scheduling model.Based on the simulation results,considering the error of the value of photovoltaic forecast in the day-ahead scheduling can effectively improve the consumption of new energy and the benefits of supplier is verified.The higher confidence degree causes the better photovoltaic tracking.The actual daily benefit is related to the cost of intra-day scheduling.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 20,2017
  • Revised:October 15,2017
  • Adopted:November 03,2017
  • Online: January 31,2018
  • Published:
Article QR Code