Anti-corrosion Design and Construction Technology for Prestressed Cast-in-place Pile with Serious Corrosion in Transmission Line Towers
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Due to serious corrosion of ground water in saline soil area, the durability of pile foundation is seriously reduced in transmission line towers. Prestressed cast-in-place pile, which was reinforced with prestressing tendon in pile body and applied prestress by the post tension method, provides significant improvement in construction durability. Through numerical examples, it is found the additional prestressing tendon can effectively increase pile body crack-control level and reduce material dosage in foundations. The advantage of GFRP guard barrel replacing steel guard barrel are narrated with the reduction of the construction costs and the local workload. The design method of prestressed cast-in-place pile, construction process and manufacture method of prestressed steel cage with tensioning and anchoring constructions control points are recommend in the paper.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 05,2017
  • Revised:August 31,2017
  • Adopted:June 09,2017
  • Online: November 27,2017
  • Published:
Article QR Code