1000 MW二次再热超超临界汽轮机组摩擦故障分析与处理
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Fault Diagnosis for a Rub Vibration Problem Occurred in a 1000 MW Ultra-supercritical Steam Turbine Unit with Double Reheat Cycles
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    国电泰州电厂3号机组为1000 MW二次再热超超临界机组,机组调试期间超高压转子、高压转子和低压转子发生不稳定振动,振动不断爬升,严重影响机组的安全稳定运行。通过对振动数据的分析,指出摩擦故障是导致超高压转子、高压转子和低压转子不稳定振动的根本原因,现场分析故障原因,改变机组启动方式,并采取现场动平衡处理,处理后摩擦故障消除,机组稳定运行。

    Abstract:

    Unsteady vibration occurred in the Ultra high-pressure rotor,high-pressure rotor and low-pressure rotor for a 1000MW ultra-supercritical turbine generator unit of Taizhou power plant during the debugging process seriously affects the safety and stable operation of the unit.On the base of the detailed vibration analysis,we found that rotor-to-stator rub is the main cause of the unsteady vibration of the three rotors.The field dynamic balancing experiment was proceeded,and the starting method of the unit was changed.The unsteady vibration problem was solved.

    参考文献
    相似文献
    引证文献
引用本文

马运翔,薛江涛,刘晓锋,卢修连,丁建良.1000 MW二次再热超超临界汽轮机组摩擦故障分析与处理[J].电力工程技术,2017,36(1):113-116

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2016-08-19
  • 最后修改日期:2016-10-12
  • 录用日期:
  • 在线发布日期: 2017-01-05
  • 出版日期:
文章二维码