±800kV特高压换流变压器现场局放试验关键技术研究
DOI:
CSTR:
作者:
作者单位:

1.国网江苏省电力公司电力科学研究院,江苏 南京 211103 ;2.国网江苏省送变电公司,江苏 南京 210028

作者简介:

蔚超(1984),男,山东莱芜人,工程师,从事变压器状态评价及诊断技术研究工作;
陆云才(1982),男,南通如皋人,工程师,从事变压器故障诊断技术研究工作;
高晓军(1979),男,江苏如东人,工程师,从事电力系统工程试验技术研究工作;

通讯作者:

中图分类号:

TM72

基金项目:


Research on Key Technology of Partial Discharge Testing for ±800 kV UHVDC Converter Transformer
Author:
Affiliation:

1.State Grid Jiangsu Electric Power Company Electric Power Research Institute, Nanjing 211103 , China ;2. State Grid Jiangsu Electric Power Transmission and Transformation Corporation, Nanjing 210028 , China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    局放试验作为变压器现场交接试验的一种,是考核变压器最严厉的方法之一,可以有效检测其内部是否存在缺陷故障。在±800 kV锦苏特高压直流输电工程中进行800 kV特高压换流变压器的现场局放交接试验中,在计算分析被试变压器的容性无功及感性补偿的基础上,首次提出了可调电抗器技术应用于现场局放试验,可调电抗器可以平滑地调节电抗值从而实时地改变感性补偿,解决了固定电抗器欠补或过补的状态,使试验稳定在最佳水平,并在试验过程中予以了验证。

    Abstract:

    As the most severe assessment method in transformer commissioning testing, partial discharge testing can effectively detect insulation faults inside transformer. In this paper, the adjustable reactor has been firstly proposed and used in the partial discharge commissioning testing of the converter transformers in Jinping-Sunan ±800 kV DC transmission project. The capacitive reactive power of the converter transformer under testing has been analyzed and the inductive compensation has been calculated. The reluctance of the adjustable reactor can be adjusted smoothly, therefore the inductive compensation can be changed continuously in real time and the under-compensation or over-compensation problems of fixed reactor can be avoided. The testing method is validated in the field commissioning testing in Jin-Su UHVDC project and the filed partial discharge testing is completely successful.

    参考文献
    相似文献
    引证文献
引用本文

蔚超,陆云才,高晓军,姚延利.±800kV特高压换流变压器现场局放试验关键技术研究[J].电力工程技术,2016,35(4):28-31. WEI Chao, LU Yuncai, GAO Xiaojun, YAO Tingli. Research on Key Technology of Partial Discharge Testing for ±800 kV UHVDC Converter Transformer[J]. Electric Power Engineering Technology,2016,35(4):28-31.

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2016-04-30
  • 最后修改日期:2016-06-11
  • 在线发布日期: 2017-03-06