TM732
国家重点研发计划资助项目“应对风/光出力不确定风险的备用容量优化配置与紧急控制技术”(2018YFB0904205)
Huaneng Group Headquarters Science and Technology Project ‘HNKJ20-H02 Huaneng Jiangsu Offshore Wind Power Development Path Optimization Research’;State Grid Jiangsu Power Company Science and Technology Project(J2019055);Postgraduate Research &Practice Innovation Program of Jiangsu Province (KYCX18_1228)
雷长炎,王琦,谢东亮,李威,赖业宁,张政.集中式储能运行备用能力的评估及仿真[J].电力工程技术,2021,40(3):15-21. LEI Changyan, WANG Qi, XIE Dongliang, LI Wei, LAI Yening, ZHANG Zheng. Evaluation and simulation on the reserve capability of centralized energy storage[J]. Electric Power Engineering Technology,2021,40(3):15-21.
复制
