基于改进单纯形法的杆塔优化规划
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

国家自然科学基金资助项目(51678293)


Optimization of transmission pole and tower planning based on Nelder-Mead simplex method
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    输电线路的杆塔规划问题是一个由简单不等式约束的多维、非线性最优化问题,且不能保证其目标函数连续或可导,故传统的算法如穷举法、试凑法、解析法等求解均有较大局限性。为了解决上述问题,采用改进单纯形算法结合外点法罚函数求解此类问题,结果表明,算法辅以将约束条件作为指数罚函数的外点法构造增广目标函数,可以方便地处理各项约束条件的限制,计算效率高,鲁棒性强,程序实现简单。同时,文中采用的算法对于可能出现的局部最优解可以根据工程经验加以判别和剔除,适用性强。

    Abstract:

    Pole and tower planning of trasmission line is a non-liner and multi-dimensional optimization problem which maybe has an discontinous or underivable objective function,so it is difficult to be resolved by traditional methods such as exhaustive method, trial-and-error method or analytical method. To solve these problems,Nelder-Mead simplex method and exterior point penalty function are used in combination to resolve pole and tower planning problem. The results show that the algorithm, supplemented by the external point method which takes the constraint condition as exponential penalty function to construct the augmented objective function, can easily deal with the constraints of various constraints.This algorithm is efficient 、and robust. It is easy to be programed,while,the possible local optimum should be excluded by engineering experience, so this algorithm has strong applicability.

    参考文献
    相似文献
    引证文献
引用本文

赵新宇,贾振宏,张瑞永,袁飞,张大长.基于改进单纯形法的杆塔优化规划[J].电力工程技术,2019,38(1):126-131

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2018-08-15
  • 最后修改日期:2018-09-21
  • 录用日期:2018-10-08
  • 在线发布日期: 2019-01-28
  • 出版日期: 2019-01-28
文章二维码