    摘要:

    大规模源网荷友好互动系统通过对负荷资源的分类、分级、分区域管理,实现对用户可中断负荷的实时精准控制,避免对变电所或线路进行整体拉闸,将电网故障的社会影响降低到最低,提升大电网故障防御能力。文中提出了在电网不同运行状态和需求场景下,参与网荷互动的用户及其可中断负荷的选择、参与策略和恢复原则,从而起到一方面实现电网频率紧急控制中的负荷快速切除与恢复;另一方面,确保在紧急控制过程中重要负荷不受影响,保障电网在紧急状态下的安全运行。

    Abstract:

    It proposes the participating network load interaction users and their interruptible load selection,participation strategy and recovery principle in different running state and demand scene of power grid.So as to achieve fast load removal and recovery in power grid frequency emergency control,on the other hand,ensure that the important load in emergency control process is not affected,and ensure the safe operation of power grid under emergency condition.

    参考文献
    [1] 罗建裕,李海峰,江叶峰,等.基于稳控技术的源网荷友好互动精准负荷控制系统[J].电力工程技术, 2017, 36(1):25-29. LUO Jianyu, LI Haifeng, JIANG Yefeng, et al. Source network load friendly interactive and precise load control system based on stability control technology[J]. Jiangsu Electrical Engineering, 2017, 36(1):25-29.
    [2] 张涛,宋家骅,程晓磊,等.可中断负荷研究综述[J].东北电力技术, 2007(6):46-48. ZHANG Tao, SONG Jiahua, CHENG Xiaolei, et al. Summary of intermittent load research[J]. Northeast Electric Power Technology, 2007(6):46-48.
    [3] 都亮,刘俊勇,田立峰,等.电力市场环境下秒级可中断负荷研究[J].中国电机工程学报, 2008,28(6):90-95. DU Liang, LIU Junyong, TIAN Lifeng, et al. Reserach on the second-class intermittent load in the electrical market[J]. Proceedings of the Case, 2008,28(6):90-95.
    [4] 朱亮,黄怡,江全元,等.多智能体开发系统SWARM在电力系统中的应用[J].高电压技术, 2008, 34(3):550-554. ZHU Liang, HUANG Yi, JIANG Quanyuan, et al. Principle and applications of multi-agent developing system swarm in power system[J]. High Voltage Engineering, 2008, 34(3):550-554.
    [5] 朱鑫要,汪惟源,汪成根,等.江苏特高压交直流输电交互影响研究[J].江苏电机工程, 2016, 35(2):39-42. ZHU Xinyao, WANG Weiyuan, WANG Chenggen, et al. Analysis of interaction between UHVAC and UHVDC for Jiangsu power grid[J]. Jiangsu Electrical Engineering, 2016, 35(2):39-42.
    [6] 李兆伟,翟海保,刘福锁,等.华东大受端电网直流接入能力评估[J].电力系统自动化, 2016, 40(16):147-152. YAO Jianguo, YANG Shengchun, WANG Ke, et al. Concept and research framework of smart grid "source-grid-load" interactive operation and control[J]. Automation of Electric Power Systems, 2016, 40(16):147-152.
    [7] 朱建全,段翩,刘明波,等.计及风险与源-网-荷双层协调的电力实时平衡调度[J].中国电机工程学报, 2015, 35(13):3239-3247. ZHU Jianquan, DUAN Pian, LIU Mingbo, et al. Electric real-time balance dispatch via bi-level coordination of source-grid-load of power system with risk[J]. Proceedings of the CSEE, 2015, 35(13):3239-3247.
    [8] 刘娅琳,杜红卫,赵浚婧,等.基于源网荷互动模式的智能配电网调度业务优化[J].华东电力, 2014, 42(7):1290-1293. LIU Yalin, DU Hongwei, ZHAO Junjing, et al. Smart distribution grid scheduling business optimization based on source network load interaction mode[J]. East China Electric Power, 2014, 42(7):1290-1293.
    [9] 姚建国,杨胜春,王珂,等.智能电网"源-网-荷"互动运行控制概念及研究框架[J].电力系统自动化, 2012, 36(21):1-6, 12. YAO Jianguo, YANG Shengchun, WANG Ke, et al. Concept and research framework of smart grid "source-grid-load" interactive operation and control[J]. Automation of Electric Power Systems, 2012, 36(21):1-6, 12.
    [10] 王锡凡,肖云鹏,王秀丽,等.新形势下电力系统供需互动问题研究及分析[J].中国电机工程学报, 2014, 34(29):5018-5028. WANG Xifan, XIAO Yunpeng, WANG Xiuli, et al. Study and analysis on supply-demand interaction of power systems under new circumstances[J]. Proceedings of the CSEE, 2014, 34(29):5018-5028.
    [11] 李轶鹏.智能电网中的需求侧响应机制[J].江西电力, 2012, 36(6):55-58. LI Yipeng. Mechanism of demand side response in smart grid[J]. Jiangxi Electric Power, 2012, 36(6):55-58.
    [12] 何彦英,曾鸣.考虑需求侧响应的配电网运行效应评估研究[J].陕西电力, 2015, 43(11):1-7, 14. HE Yanying, ZENG Ming. Effect evaluation of demand response on distribution network operation[J]. Shaanxi Electric Power, 2015, 43(11):1-7, 14.
    [13] 崔传建,李博,李思维,等.面向电力用户的一种通用互动服务平台设计[J].电力系统通信, 2012, 33(9):30-33. CUI Chuanjian, LI Bo, LI Siwei, et al. Design of general interactive service platform for power users[J]. Telecommunications for Electric Power System, 2012, 33(9):30-33.
    [14] 窦健,董俐君,朱新山,等.结构化用电客户互动需求信息的比对库设计[J].电力系统及其自动化学报, 2016, 28(6):80-85. DOU Jian, DONG Lijun, ZHUXinshan, et al. Design of the comparative database for structured interactive demand information of electricity customers[J]. Proceedings of the CSU-EPSA, 2016, 28(6):80-85.
    [15] 王军,武文广,李逸驰,等.支撑互动用电的用电信息采集系统基本构成与关键技术[J].陕西电力, 2016, 44(4):1-5. WANG Jun, WUWenguang, LI Yichi, et al. Basic structure and key technology of power utilization information acquisition system for securitying interactive service[J]. Shaanxi Electric Power, 2016, 44(4):1-5.
    [16] 凌卫家,孙维真,叶琳,等.浙江交直流混联电网特性分析及运行控制[J].浙江电力,2016,35(9):8-14. LING Weijia,SUN Weizhen,YE Ling,et al. Characteristics analysis and operation control of Zhejiang hybrid AC/DC power grid[J]. Zhejiang Electric Power,2016,35(9):8-14.
    [17] 方超,陈楚,熊政,等.基于用户可中断负荷的实时负荷控制决策技术应用[J].电力工程技术, 2017, 36(4):20-23. FANG Chao, CHEN Chu, XIONG Zheng, et al. Application of real-time load control decion based on user intermittent load[J]. Jiangsu Electrical Engineering, 2017, 36(4):20-23.
    引证文献
    网友评论
    网友评论
    分享到微博
    发 布
引用本文

仇晨光,程锦闽,李新家,熊政,李平.网荷互动用户可中断负荷选择与恢复策略研究[J].电力工程技术,2018,37(4):33-37,70

复制
分享
文章指标
  • 点击次数:1462
  • 下载次数: 2525
  • HTML阅读次数: 0
  • 引用次数: 0
历史
  • 收稿日期:2018-03-21
  • 最后修改日期:2018-04-28
  • 录用日期:2018-04-02
  • 在线发布日期: 2018-07-26
文章二维码